033 343 1352 susan@naturestamp.com

The applicant proposes construction of a link road between Chase Valley and Otto’s Bluff. The route crosses a watercourse and proposed construction is anticipated to have significant impacts on this system. A wetland offset is required.

Wetland offsets address residual impacts to both the intrinsic value of wetlands as well as their value in terms of water resources, hydrological functioning and ecosystem services.