033 343 1352 susan@naturestamp.com

A new dam is proposed for construction at the confluence of two small streams outside Winterton. NatureStamp was appointed to conduct a Water Balance and Yield Determination Study to determine streamflow yield of the dam catchments and establish the feasibility of constructing a dam and assess water demands/water outputs.